For pre-commissioning / commissioning of newly installed power systems and cooling systems
For testing existing installations to prove performance and give reassurance under full load conditions
Partial or off-load running can result in glazing of bores, increased oil consumption and smokey emmissions. Load testing burns off the accumulated unburnt oily residues, which restores performance and the emissions back to the original specification.
Our qualified engineers will help setup, install and assist with testing if required.